All Featured Tenders Featured tenders from
Get free alerts
Featured tenders from
Philippines
Showing 45 featured tenders from this country. More available on Tenderwell.
PIPELAYING AND CONCRETE RESTORATION WORKS INCLUDING RESTORATION MATERIALS (INFRA01)
The Candelaria Water District is issuing a procurement for pipelaying and concrete restoration works within the municipality of Candelaria, Quezon. The project is divided into two sequential phases: Phase 1 (Bukal Sur) covering approximately 4,278 linear meters and Phase 2 (Mangilag Sur – Malabanban Norte) covering about 4,799 linear meters. Over the entire scope, the contract requires the installation of uPVC pipework ranging from 50 mm to 150 mm in diameter, horizontal boring crossings of 6‑inch and 8‑inch pipelines, and full trenching, excavation, and backfilling operations.
The works include excavation and trenching in 300‑meter segments, installation assistance for valves and fittings, concrete sidewalk restoration, hydrotesting of the installed pipelines, hauling and disposal of excavated materials, and the necessary site safety and traffic management support. Skilled labor, comprising foremen, pipe fitters, and masons, together with unskilled laborers, will perform the tasks using appropriate excavation and hauling tools and equipment, while concrete strength testing assistance will be provided to guarantee the integrity of the restored sidewalks. Completion of the entire project is required within 329 calendar days from the receipt of the Notice to Proceed.
All activities must adhere to the applicable DPWH Department Order by restoring each 300‑meter segment before proceeding to the next, thereby ensuring compliance with the specified procedural and technical standards.
The works include excavation and trenching in 300‑meter segments, installation assistance for valves and fittings, concrete sidewalk restoration, hydrotesting of the installed pipelines, hauling and disposal of excavated materials, and the necessary site safety and traffic management support. Skilled labor, comprising foremen, pipe fitters, and masons, together with unskilled laborers, will perform the tasks using appropriate excavation and hauling tools and equipment, while concrete strength testing assistance will be provided to guarantee the integrity of the restored sidewalks. Completion of the entire project is required within 329 calendar days from the receipt of the Notice to Proceed.
All activities must adhere to the applicable DPWH Department Order by restoring each 300‑meter segment before proceeding to the next, thereby ensuring compliance with the specified procedural and technical standards.
Sector:
Construction workDeadline:
22 Jul 202626CSHE01 - REQUEST FOR EXPRESSION OF INTEREST (REOI) - Consulting Services for the Geological & Geotechnical Investigation (Standard Penetration Test (SPT) and Electrical Resistivity Sur
The Department of Public Works and Highways – Cebu 2nd District Engineering Office is seeking consulting services to conduct a comprehensive geological and geotechnical investigation for its various projects. The work will involve field surveys and investigations that cover geohazard assessment, geological and geotechnical investigation, and the execution of Standard Penetration Tests (SPT) and Electrical Resistivity surveys. Consultants will be required to compile and submit a Design Data Collection (DDC) report, along with any special studies and other requisite documentation, that provide the necessary data for project design and risk mitigation.
The contract requires the consultant to perform all investigations within the jurisdictional area assigned by the Office, ensuring that all testing and data collection meet the specified technical standards and deliverables. All field testing and reporting must comply with the national geotechnical testing standards as mandated by the Philippine Institute of Civil Engineers.
The contract requires the consultant to perform all investigations within the jurisdictional area assigned by the Office, ensuring that all testing and data collection meet the specified technical standards and deliverables. All field testing and reporting must comply with the national geotechnical testing standards as mandated by the Philippine Institute of Civil Engineers.
Sector:
Architectural, construction, engineering and inspection servicesDeadline:
30 Jun 202625CSE00004 - Consulting Services on the Conduct of Sub-Soil Investigation for the: Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide – Secondary Roads – Mogpog – Balanaca
The Department of Public Works and Highways – Region IV‑B is seeking qualified consulting firms to conduct a comprehensive sub‑soil investigation for the rehabilitation or reconstruction of a 1.365‑kilometre section of secondary roads along the Mogpog‑Balanacan Port Road in Marinduque, where the corridor has experienced slips, slope collapse and landslide. The engagement will require the identification and detailed characterisation of subsurface soil conditions, including soil type, strength, drainage properties and potential geotechnical hazards, to inform the design and execution of a safer, more durable road alignment.
Contracted consultants must assemble a capable project team, ideally led by a professional holding a Master’s or Doctoral degree, and demonstrate prior experience with similar DPWH road projects. Deliverables will include geotechnical reports, subsurface mapping, recommendations for ground improvement or cut‑fill stabilization, and a coordination plan with the civil engineering design team. The scope of work must be completed within 46 calendar days from contract award, with the firm maintaining a record of current workload to assure capacity for on‑time delivery. The investigation shall meet Philippine engineering standards for subsurface soil assessment.
Contracted consultants must assemble a capable project team, ideally led by a professional holding a Master’s or Doctoral degree, and demonstrate prior experience with similar DPWH road projects. Deliverables will include geotechnical reports, subsurface mapping, recommendations for ground improvement or cut‑fill stabilization, and a coordination plan with the civil engineering design team. The scope of work must be completed within 46 calendar days from contract award, with the firm maintaining a record of current workload to assure capacity for on‑time delivery. The investigation shall meet Philippine engineering standards for subsurface soil assessment.
Sector:
Architectural, construction, engineering and inspection servicesDeadline:
30 Jun 2026REBIDDING OF HIRING OF CONSULTANCY SERVICES FOR THE CONDUCT OF EVALUATION OF SELECTED RICE AND CORN BANNER PROGRAM INTERVENTIONS FOR THE ILOCOS REGION
The Department of Agriculture – Regional Field Office 1 has issued a rebidding solicitation for consultancy services to conduct a comprehensive evaluation of selected Rice and Corn Banner Program interventions within the Ilocos region. The engagement targets three distinct assessment components: an outcome/process review of the provision of seeds, fertilizers, and machinery under the Rice Program's production support services; an outcome assessment of the Yellow and White Corn Production Enhancement Program; and an impact evaluation of completed recirculating dryers installed in Region 1. This project requires a methodology that rigorously measures program effectiveness, efficiency, and the broader socioeconomic impact on local farmers, while aligning with the Department’s performance monitoring framework.
Consultants will be expected to design and implement structured evaluation protocols that capture quantitative and qualitative data across the three program components, analyze trends, and produce actionable recommendations for policy makers. The engagement mandates strict adherence to the Government Procurement Reform Act (RAÂ 9184) and its implementing rules, ensuring transparency, merit-based selection, and compliance with public procurement standards.
Consultants will be expected to design and implement structured evaluation protocols that capture quantitative and qualitative data across the three program components, analyze trends, and produce actionable recommendations for policy makers. The engagement mandates strict adherence to the Government Procurement Reform Act (RAÂ 9184) and its implementing rules, ensuring transparency, merit-based selection, and compliance with public procurement standards.
Sector:
Research and development services and related consultancy servicesDeadline:
6 Jul 2026Construction of Thermal Decomposition Facility Building in Cabulihan, Limasawa
The Municipality of Limasawa in Southern Leyte solicits bids for the construction of a dedicated thermal decomposition facility building located in Cabulihan. The project requires a prefabricated structure measuring 10.00 m in length and 15.00 m in width, designed to accommodate high‑temperature waste decomposition operations. Completion of the entire works must be achieved within a 100‑calendar‑day period from contract award.
Qualified bidders—Filipino citizens, sole proprietors, cooperatives, partnerships, or entities with at least 60 % Philippine ownership—are invited to submit proposals that demonstrate prior experience delivering a comparable civil‑works project within the preceding three years. The contract will be evaluated under the New Government Procurement Act using a pass/fail criterion, and bids exceeding the approved budgeted amount will be rejected outright.
All submissions must include the required bid security and be received by the specified deadline. Works must meet the stipulated dimensional requirements and be completed on schedule. All of the above construction requirements are subject to the governing procurement regulations and standards of the Local Government Unit.
Qualified bidders—Filipino citizens, sole proprietors, cooperatives, partnerships, or entities with at least 60 % Philippine ownership—are invited to submit proposals that demonstrate prior experience delivering a comparable civil‑works project within the preceding three years. The contract will be evaluated under the New Government Procurement Act using a pass/fail criterion, and bids exceeding the approved budgeted amount will be rejected outright.
All submissions must include the required bid security and be received by the specified deadline. Works must meet the stipulated dimensional requirements and be completed on schedule. All of the above construction requirements are subject to the governing procurement regulations and standards of the Local Government Unit.
Sector:
Construction workDeadline:
30 Jun 2026Get instant alerts for tenders from Philippines.
Free email alerts — no account required.